{"id":7325,"date":"2026-04-09T17:39:36","date_gmt":"2026-04-09T15:39:36","guid":{"rendered":"https:\/\/caas-mali.de\/uncategorized\/2026\/04\/09\/a-new-school-building-is-under-construction\/"},"modified":"2026-04-09T18:04:44","modified_gmt":"2026-04-09T16:04:44","slug":"a-new-school-building-is-under-construction","status":"publish","type":"post","link":"https:\/\/caas-mali.de\/en\/current-news\/2026\/04\/09\/a-new-school-building-is-under-construction\/","title":{"rendered":"A new school building"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><br>The middle school in Kalassa (grades 7\u20139) has been in operation since 2024. Now, the primary school is also being strengthened with a new building. Thanks to a generous donation, construction is currently underway on the school grounds in Kalassa, following the architectural model of the existing middle school.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"759\" src=\"https:\/\/caas-mali.de\/wp-content\/uploads\/2026\/04\/Schule_Gang.jpg\" alt=\"\" class=\"wp-image-7313\" srcset=\"https:\/\/caas-mali.de\/wp-content\/uploads\/2026\/04\/Schule_Gang.jpg 1024w, https:\/\/caas-mali.de\/wp-content\/uploads\/2026\/04\/Schule_Gang-300x222.jpg 300w, https:\/\/caas-mali.de\/wp-content\/uploads\/2026\/04\/Schule_Gang-767x568.jpg 767w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Middle School in Kalassa: Louvered Windows and Shaded Outdoor Space<\/figcaption><\/figure>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\"><strong>Climate-adapted architecture<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The new school buildings are characterized by carefully designed, climate-adapted architecture: light-filled classrooms, effective natural ventilation, shaded walkways, and robust, durable materials.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the future, the entire school complex is planned to be equipped with solar power. This will not only allow classrooms to be cooled with fans, but also enable their use in the evenings\u2014for example, for community gatherings and events.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"740\" src=\"https:\/\/caas-mali.de\/wp-content\/uploads\/2026\/04\/Baustelle3.jpg\" alt=\"\" class=\"wp-image-7310\" srcset=\"https:\/\/caas-mali.de\/wp-content\/uploads\/2026\/04\/Baustelle3.jpg 1024w, https:\/\/caas-mali.de\/wp-content\/uploads\/2026\/04\/Baustelle3-300x217.jpg 300w, https:\/\/caas-mali.de\/wp-content\/uploads\/2026\/04\/Baustelle3-768x555.jpg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">School construction site in Kalassa, April 2026<\/figcaption><\/figure>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\"><a href=\"https:\/\/caas-mali.de\/en\/school-education-in-kalassa\/\"><em>&gt; Read more about school education in Kalassa <\/em><\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The middle school in Kalassa (grades 7\u20139) has been in operation since 2024. Now, the primary school is also being strengthened with a new building. &#8230; <\/p>\n<p class=\"read-more-container\"><a title=\"A new school building\" class=\"read-more button\" href=\"https:\/\/caas-mali.de\/en\/current-news\/2026\/04\/09\/a-new-school-building-is-under-construction\/#more-7325\" aria-label=\"Read more about A new school building\">weiterlesen<\/a><\/p>\n","protected":false},"author":2,"featured_media":7305,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_crdt_document":"","footnotes":""},"categories":[129],"tags":[130],"class_list":["post-7325","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-current-news","tag-school-construction","masonry-post","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"_links":{"self":[{"href":"https:\/\/caas-mali.de\/en\/wp-json\/wp\/v2\/posts\/7325","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/caas-mali.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/caas-mali.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/caas-mali.de\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/caas-mali.de\/en\/wp-json\/wp\/v2\/comments?post=7325"}],"version-history":[{"count":3,"href":"https:\/\/caas-mali.de\/en\/wp-json\/wp\/v2\/posts\/7325\/revisions"}],"predecessor-version":[{"id":7328,"href":"https:\/\/caas-mali.de\/en\/wp-json\/wp\/v2\/posts\/7325\/revisions\/7328"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/caas-mali.de\/en\/wp-json\/wp\/v2\/media\/7305"}],"wp:attachment":[{"href":"https:\/\/caas-mali.de\/en\/wp-json\/wp\/v2\/media?parent=7325"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/caas-mali.de\/en\/wp-json\/wp\/v2\/categories?post=7325"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/caas-mali.de\/en\/wp-json\/wp\/v2\/tags?post=7325"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}